Flat Rate Times

The “Flat Rate Times” is the list of repair operation codes with the respective time allowances. The times file may be downloaded and imported into local management programmes, in order to use the job times specified for formulating quotes or organising the workshop.

The relative active subscription is required to access and view this documentation.